![Silver Springs](http://www.t-cubeprojects.in/wp-content/uploads/2019/05/SS-1350X600-Rera-350x280.jpg)
Kadungamangalam, Thripunithura
Kadungamangalam, Thripunithura
16 luxury villas
80 lakhs - 1 Cr
T-Cube Projects , EVM Gardens a gated community situated amidst lush green surroundings in 1.5 acre Land in Thiruvankulam Ernakulam. The project comprises of 16 Villas in 3 rows , Now we have villas in two different floor plans for sale 1741 Sqft and 1773 Sqft area respectively. Each villa built in 4 cents, 4.5 cents and 5.5 cents and having 4 bedrooms , (Villas in 2044, 2200 and 2227 Sqft area are already sold out) . Each bedroom with attached toilet and dress area. FOUNDATION-Random rubble foundation, SUPER STRUCTURE-Load bearing solid concrete blocks, FLOORING- Vitrified tile flooring of Kajaria or equivalent, DOORS/WINDOWS-Anjili/Chruteak/ for wooden frames and shutters, FRONT DOOR/SHUTTER-Teak wood front main door shutter and teak wood shutter for windows on front sit-out,TOILET-Jaguar brand bathroom fittings with health faucet and wall mixer, one bath tub and one shower panel .Flooring with anti skid ceramic tiles, ceramic tiles dadoing up to roof. Spacious kitchen and work area, CAR PARKING-individual car parking and visitors parking. Paved interior road with street light , 24x7 security ,Indoor swimming pool , health club and Club house and children’s play area ,generator backup for common area and much more. Please contact our office for aforesaid floor plans (1741 Sqft and 1773 Sqft area)
Please feel free to contact us for more details , 9249513466 / 9249513455.
![]() | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() |